Coop building, day 3
Roof panels are on. Clean out door/chicken door combo is cut. Latches and locks are temporarily on.
This area will be painted and covered in hardware cloth. For the winter, I will partially cover this to prevent drafts.
Inside skylight view. My uncle bought smoke panels. Yes, the roof is a pallet :)
For now, the vents are 6 holes that need to be cleaned up. If it ends up not being enough, we will take off the vents and make the openings bigger. There is a vent on the back and both sides.
Looking good so far!